Our Project Portfolio

Audited track record of 11 on-going contracts and prestigious completed infrastructure developments across national and state highways.

Utility Shifting Works EHT Line Along NH83 ROW
Power Corridors On-Going

Utility Shifting Works EHT Line Along NH83 ROW

NHAI – PIU Dindigul (Various Locations along ROW)

₹ 2,587 Lakhs
Construction of Embankment Bed Earth Works NH-716B
Highway Earthworks On-Going

Construction of Embankment Bed [Earth Works] NH-716B–IV

National Highway Corridor, South Tamil Nadu

₹ 1,983 Lakhs
Utility Shifting Works EHT and HT LT Package I Fleet
Transmission Towers On-Going

Utility Shifting Works EHT and HT/LT Package – I

High-Voltage Transmission Network, Tamil Nadu

₹ 571 Lakhs
Metal Beam Crash Barrier & Signage
Safety Furniture On-Going

Short-Term Rectification: Metal Beam Crash Barrier & Signage

Solar Blinkers, Impact Attenuators, Thermoplastic Marking

₹ 412 Lakhs
Strengthening of Road MRL-02 M.Edayapatti to Thethur
PMGSY Rural Road On-Going

Strengthening of Road MRL-02 M.Edayapatti to Thethur

Km 0/0-5/380, Tiruchirappalli Dt (PMGSY Batch-I-2024-25, 5-Yr Pkg)

₹ 364 Lakhs
Hotspots / Accident Spots Rectification Works
Blackspot Correction On-Going

Hotspots / Accident Spots Rectification Works

NH-44, NH-209 (New No. 83) and NH-38 (Old NH-45B)

₹ 295 Lakhs
Annual Maintenance NH-36 Road Surface
Annual Maintenance On-Going

Annual Maintenance & Incident Management NH-36

Thanjavur to Pudukkottai (Km 174+000 to Km 229+228)

₹ 290 Lakhs
Utility Shifting Works EHT NH-45C Plant
Hybrid Annuity Mode On-Going

Utility Shifting Works EHT & HT/LT NH-45C NHDP Phase-IV

MoRTH HAM Package Corridor

₹ 150 Lakhs
Sevugampatti Toll Plaza at Km 27+900
Toll & ETC On-Going

Re-establishment of Sevugampatti Toll Plaza at Km 27+900

NH-183 Dindigul to Theni Section with System Integration

₹ 79 Lakhs
School Building Construction SIDS Scheme
Public Infrastructure On-Going

School Building Construction (SIDS Scheme)

DRDA School Infrastructure Development Scheme

₹ 66 Lakhs
Short-Term Rectification Measures Rate Basis
Highway Furniture On-Going

Short-Term Rectification Measures (Rate Basis)

Crash Barriers, Road Studs, Speed Tables & Marking

₹ 412 Lakhs
Supply of 15 Lakhs Cu.M Crushed Aggregates
Crushed Aggregates Completed

Supply of 15 Lakhs Cu.M Crushed Aggregates

Delivered within 16-month contract duration

₹ 447 Lakhs
Annual Maintenance of NH-45B Sensor Paver Finishing
Corridor Maintenance Completed

Annual Maintenance of NH–45B Dindigul – Theni – Kumuli

Full Route Asset Management & Routine Maintenance

₹ 640 Lakhs
Accident Spots Rectification in NH-44 & NH-209
Blackspot Mitigation Completed

Accident Spots Rectification in NH-44 & NH-209

Civil Realignment and High-Impact Barricades

₹ 215 Lakhs
Rural Road Works in Namakku Naame Thittam
Rural Connectivity Completed

Rural Road Works in Namakku Naame Thittam [NNT] Mode

Successfully completed ahead of scheduled timeline

₹ 163 Lakhs
School Building Construction for DRDA
Public Works Completed

School Building Construction for DRDA

District Rural Development Agency [DRDA]

₹ 130 Lakhs
Earthwork of 3 Lakhs Cu.M DRN Infra
Mass Earthworks Completed

Earthwork of 3 Lakhs Cu.M (BC/Wet Slurry Removal)

Site disposal to 3 km lead for M/s DRN Infra Projects

₹ 39 Lakhs